|
|
Engineering Quadrangle
Engineering buildings in 1994. Anderson Hall is on the right and the then recently completed Civil Engineering Building, now dedicated as the Oliver H. Raymond Building, is in the center. A portion of ASTeCC can be seen under construction on the left. This view is from the Office Tower.
Engineering buildings circa 1910. |
|